| 1. The parameter(s) which determines which specific data will appear in the Material Master is/are |
| (a) plant |
| (b) company code |
| (c) material type |
| (d) industry sector |
| 2. Which department can enter data in Material Master is determined by |
| (a) department |
| (b) plant |
| (c) material type |
| (d) storage location |
| 3. The level at which classification view in Material Master is defined at |
| (a) storage location |
| (b) valuation type |
| (c) plant & client |
| (d) client |
| 4. The alternate unit of measure is defined in Material Master in |
| (a) Basic data 1 view |
| (b) Additional data screen |
| (c) Storage view |
| (d) MRP view |
| 5. With backflushing |
| (a) we can post goods issue for the for the components of a Production order |
| (b) we can post a goods receipt for the by-product |
| (c) we can create a Material Master |
| (d) all the above are true |
| 6. The characteristics of materials is defined in Material Master in |
| (a) MRP1 view |
| (b) Work Scheduling view |
| (c) Classification view |
| (d) None of the above |
| 7. Production Scheduler is maintained in Material Master in |
| (a) Production view |
| (b) Storage view |
| (c) Work Scheduling view |
| (d) MRP view |
| 8. If a material has to be backflushed only in specific Work Centre, then the data has to be maintained in |
| (a) Material Master |
| (b) Routing |
| (c) BOM |
| (d) Work Centre |
| 9. What is the field length of material number in Material Master? |
| (a) 40 |
| (b) 18 |
| (c) 12 |
| (d) 16 |
| 10. BOM is called recursive when |
| (a) the BOM contains two identical components |
| (b) the base quantity is unit |
| (c) the components are non-stock item |
| (d) the component and header item are same |