| 1 | In order to use product order costing functionality, it is absolutely essential that inventory be valued at the ___________________ level. | ||||||||||||
| a. client | |||||||||||||
| b. company code | |||||||||||||
| c. plant level | |||||||||||||
| d. storage location | |||||||||||||
| e. business area | |||||||||||||
| 2 The data that is applicable to the whole organization levels is called ___________ level data. | |||||||||||||
| a. client | |||||||||||||
| b. company code | |||||||||||||
| c. plant level | |||||||||||||
| d. storage location | |||||||||||||
| e. business area | |||||||||||||
| 3 | The material master which is common to all organization levels can be created without any material type. | ||||||||||||
| The above statement is ___________ . | |||||||||||||
| a. True | |||||||||||||
| b. False | |||||||||||||
| 4 | The material type determines which accounts are posted when a material enters or leaves the ware house. | ||||||||||||
| The above statement is ___________. | |||||||||||||
| c. True | |||||||||||||
| d. False | |||||||||||||
| 5 You can change the material type of a material without restriction even if stocks, reservations, or purchasing document exist for the material. | |||||||||||||
| The above statement is ___________ . | |||||||||||||
| e. True | |||||||||||||
| f. False | |||||||||||||
| 6 You can hide the industry sector field in the material master without putting any default value in it. | |||||||||||||
| The above statement is ___________ . | |||||||||||||
| g. True | |||||||||||||
| h. False | |||||||||||||
| 7 | Configurable material chek for a material is set in _______________ view. | ||||||||||||
| a. Work scheduling | |||||||||||||
| b. Variant view | |||||||||||||
| c. Basic data view | |||||||||||||
| d. MRP view | |||||||||||||
| e. Super BOM | |||||||||||||
| 8 | The type of number assignment (external/ internal) for material master record depends on: | ||||||||||||
| a. Material Group | |||||||||||||
| b. Cross plant status of the material type | |||||||||||||
| c. Material Type | |||||||||||||
| d. Industry Sector | |||||||||||||
| e. Screen Sequence | |||||||||||||
| 9 The unit in which the stock keeping is done or inventories or valued in company is called: | |||||||||||||
| a. Stock Unit of Measure | |||||||||||||
| b. Valuation Unit of Measure | |||||||||||||
| c. Base Unit of Measure | |||||||||||||
| d. Unit of issue | |||||||||||||
| e. Purchase unit of measure | |||||||||||||
| 10 You can group together several units of measure in a _______________. | |||||||||||||
| a. material type | |||||||||||||
| b. material group | |||||||||||||
| c. unit of measure group | |||||||||||||
| d. MRP group | |||||||||||||
| e. Alternate Group | |||||||||||||
| ###### | For a material the cross plant status is dominant and this maintained in ___________ view of a material master. | ||||||||||||
| a. Basic Data | |||||||||||||
| b. MRP | |||||||||||||
| c. Work Scheduling | |||||||||||||
| d. Costing | |||||||||||||
| e. Classification | |||||||||||||
| ###### | We can add views to some existing material maters through _____________ or ________________. | ||||||||||||
| a. Change material transaction | |||||||||||||
| b. Create Material transaction | |||||||||||||
| c. Add material transaction | |||||||||||||
| d. Extend material transaction | |||||||||||||
| e. Append material transaction | |||||||||||||
| f. Join material transaction | |||||||||||||
| g. Create views transaction | |||||||||||||
| h. Extend views transaction | |||||||||||||
| 13 BOM Categories are used to identify a bill of material use within the SAP system. Please name any three SAP standard BOM categories: | |||||||||||||
| 1.__ | |||||||||||||
| 2___ _____________ | |||||||||||||
| 3__ | |||||||||||||
| 14 Material BOM that is created without plant is called ________________. | |||||||||||||
| a. reference BOM | |||||||||||||
| b. reference Group | |||||||||||||
| c. master BOM | |||||||||||||
| d. group BOM | |||||||||||||
| e. master group | |||||||||||||
| 15 | BOMs that are created in different plants of the same company code for same header material have the same BOM number (internally generated number). | ||||||||||||
| The above statement is ___________ . | |||||||||||||
| i. True | |||||||||||||
| j. False | |||||||||||||
| 16 | There are following three of technical types available in the standard SAP system: | ||||||||||||
| 1. ___________ | |||||||||||||
| 2. ____________ | |||||||||||||
| 3. _________________ | |||||||||||||
| 17 | It is possible to change the item category for a BOM item through the change BOM transaction (CS02). | ||||||||||||
| The above statement is ___________ . | |||||||||||||
| a. True | |||||||||||||
| b. False | |||||||||||||
| 18 It is mandatory to have a master record for a item to be used as a BOM item except for the _____________________ item. | |||||||||||||
| a. stock | |||||||||||||
| b. non stock | |||||||||||||
| c. variable size | |||||||||||||
| d. document | |||||||||||||
| e. class item | |||||||||||||
| 19 If a header material is used as a BOM item in the same BOM the BOM is referred as __________________. | |||||||||||||
| 1. repetitive BOM | |||||||||||||
| 2. alternate BOM | |||||||||||||
| 3. multiple BOM | |||||||||||||
| 4. flexible BOM | |||||||||||||
| 5. recursive BOM | |||||||||||||
| 20 Alternate BOMs are grouped under one internal number and are called ______________. | |||||||||||||
| a. multiple BOM | |||||||||||||
| b. variant BOM | |||||||||||||
| c. variable BOM | |||||||||||||
| d. super BOM | |||||||||||||
| e. header BOM | |||||||||||||
| 21 Multiple BOMs have the ___a________ material same and differ in ___b___ . | |||||||||||||
| a. BOM header | |||||||||||||
| b. BOM items | |||||||||||||
| 22 Multiple BOM can be converted in Variant BOM. | |||||||||||||
| The above statement is ___________ . | |||||||||||||
| A. True | |||||||||||||
| B. False | |||||||||||||
| 23 In standard SAP system the BOM selection may be controlled through following three ways: | |||||||||||||
| 1._ __________________ | |||||||||||||
| 2. ______________________ | |||||||||||||
| 3. __________________________ | |||||||||||||
| 24. The routing which is created without any work center is called reference operation set. | |||||||||||||
| The above statement is ___________ . | |||||||||||||
| A. True | |||||||||||||
| B. False | |||||||||||||
| 25. A particular material is to be backflushed always when it passes through a particular work center. In this case back flush indicator will be set in ___________________. | |||||||||||||
| a. material master of the material | |||||||||||||
| b. work center | |||||||||||||
| c. routing | |||||||||||||
| d. material master and routing | |||||||||||||
| e. work center and material master | |||||||||||||
| 26. Rough-cut planning profiles are used in _______________________. | |||||||||||||
| a. lead time scheduling | |||||||||||||
| b. inspection planning | |||||||||||||
| c. sales and operation planning | |||||||||||||
| d. capacity planning | |||||||||||||
| e. standard network | |||||||||||||
| 27. __d________________indicators are used __b____________ data to prevent the change of default values in routings. | |||||||||||||
| a. Prevention | |||||||||||||
| b. Fixing | |||||||||||||
| c. Permanent | |||||||||||||
| d. Reference | |||||||||||||
| e. default | |||||||||||||
| 28. Activity types are used in ________________________ view of the work center data. | |||||||||||||
| a. basic data | |||||||||||||
| b. capacity | |||||||||||||
| c. scheduling | |||||||||||||
| d. costing | |||||||||||||
| e. default | |||||||||||||
| 29. One work center can be assigned to a maximum of three cost centers at a time. | |||||||||||||
| The above statement is ___________ . | |||||||||||||
| A. True | |||||||||||||
| B. False | |||||||||||||
| 30. One work center can be assigned to several hierarchies. | |||||||||||||
| The above statement is ___________ . | |||||||||||||
| A. True | |||||||||||||
| B. False | |||||||||||||
| 31. Confirmation options for operations in routing are maintained in _________________. | |||||||||||||
| a. operation detail screen | |||||||||||||
| b. sequence overview screen | |||||||||||||
| c. standard value key | |||||||||||||
| d. operation control key | |||||||||||||
| e. routing header screen | |||||||||||||
| 32. Alternative sequences in routing are created with reference to ______________. | |||||||||||||
| a. parallel sequence | |||||||||||||
| b. master sequence | |||||||||||||
| c. standard sequence | |||||||||||||
| d. reference sequence | |||||||||||||
| e. key sequence | |||||||||||||
| 33. A reference operation set allows a maximum of one alternate and one parallel sequence. | |||||||||||||
| The above statement is ___________ . | |||||||||||||
| A. True | |||||||||||||
| B. False | |||||||||||||
| 34. Component scrap increases the quantity of a component and it can be maintained in _________________________. | |||||||||||||
| a. material master only | |||||||||||||
| b. BOM only | |||||||||||||
| c. Routing only | |||||||||||||
| d. Material master and/ or BOM | |||||||||||||
| e. Material master and work center | |||||||||||||
| 35. Assembly scrap increases the quantity of all components and is maintained in ____________________. | |||||||||||||
| a. material master | |||||||||||||
| b. work center | |||||||||||||
| c. routing | |||||||||||||
| d. operation detail screen | |||||||||||||
| e. BOM header screen | |||||||||||||
| 36. Location groups are used to determine the transport time and are maintained in _______________. | |||||||||||||
| a. work center master data | |||||||||||||
| b. routing | |||||||||||||
| c. activity types | |||||||||||||
| d. shift definition | |||||||||||||
| e. transport master | |||||||||||||
| 37. The working area in engineering workbench consists of focus and ________________. | |||||||||||||
| a. work area | |||||||||||||
| b. working environment | |||||||||||||
| c. work header | |||||||||||||
| d. focus item | |||||||||||||
| e. focus header | |||||||||||||
| 38. Scheduling margin key consists of the following elements: | |||||||||||||
| 39. The field selection settings for a work center can be released and transported. | |||||||||||||
| The above statement is ___________ . | |||||||||||||
| A. True | |||||||||||||
| B. False | |||||||||||||
| 40. A parallel sequence allows the processing of operations concurrently with others. | |||||||||||||
| The above statement is ___________ . | |||||||||||||
| A. True | |||||||||||||
| B. False | |||||||||||||