1.
The parameter(s) which determines which
specific data will appear in the Material Master is/are
(a)
plant
(b)
company code
(c)
material type
(d)
industry sector
2.
Which department can enter data in
Material Master is determined by
(a)
department
(b)
plant
(c)
material type
(d)
storage location
3.
The level at which classification view in
Material Master is defined at
(a)
storage location
(b)
valuation type
(c)
plant & client
(d)
client
4.
The alternate unit of measure is defined
in Material Master in
(a)
Basic data 1 view
(b)
Additional data screen
(c)
Storage view
(d)
MRP view
5.
With backflushing
(a)
we can post goods issue for the for the
components of a Production order
(b)
we can post a goods receipt for the
by-product
(c)
we can create a Material Master
(d)
all the above are true
6.
The characteristics of materials is
defined in Material Master in
(a)
MRP1 view
(b)
Work Scheduling view
(c)
Classification view
(d)
None of the above
7.
Production Scheduler is maintained in
Material Master in
(a)
Production view
(b)
Storage view
(c)
Work Scheduling view
(d)
MRP view
8.
If a material has to be backflushed only
in specific Work Centre, then the data has to be maintained in
(a)
Material Master
(b)
Routing
(c)
BOM
(d)
Work Centre
9.
What is the field length of material
number in Material Master?
(a)
40
(b)
18
(c)
12
(d)
16
10.
BOM is called recursive when
(a)
the BOM contains two identical components
(b)
the base quantity is unit
(c)
the components are non-stock item
(d)
the component and header item are same
11.
BOM can be used for
(a)
MRP
(b)
Inspection plan
(c)
Costing
(d)
All the above
12.
Variant BOM has the following features
(a)
it has different header material
(b)
components has to be identical
(c)
component quantity can be changed
(d)
components can be changed, added or
deleted
13.
Technical type of Alternative BOM is
(a)
A
(b)
V
(c)
D
(d)
M
14.
Standard value key in Work Centre is
attached to Work Centre in the Screen of
(a)
Basic data
(b)
Capacities
(c)
Scheduling
(d)
Costing
15.
Default values maintained in Work Centre
is/are
(a)
Standard value key
(b)
Control key
(c)
Backflushing
(d)
Standard text key
16.
Which of the following statement(s)
is/are false
(a)
One Work Centre can be assigned to
maximum six Cost centres
(b)
One Cost Centre can be assigned to only
one Work Centre
(c)
One Work Centre can be attached to only
one Cost Centre
(d)
One Cost Centre may be assigned to
multiple Work Centre
17.
What is/are the object(s) that can be
maintained through Engineering Workbench
(a)
Material Master
(b)
BOM
(c)
Work Centre
(d)
Routing
18.
PRT is assigned at the level of
(a)
Routing header
(b)
Routing operation
(c)
Component
(d)
All the above
19.
Engineering Change Management is used to
(a)
document the changes in different objects
(b)
display master data
(c)
display multi level BOM
(d)
display Product Structure
20. Different
type of sequences of Routing are
(a)
Master Sequence
(b)
Standard Sequence
(c)
Parallel Sequence
(d)
Alternate Sequence
21.
If components are not assigned to
operations in a Routing, it is automatically assigned to
(a)
most critical operation
(b)
first operation
(c)
operation with shortest duration
(d)
last operation
22.Confirmation options of operation are defined by
(a)
Operation detail screen
(b)
Standard value key
(c)
Control key
(d)
Sequence of Routing
23.Activity type is attached in the following screen of Work
Centre
(a)
Basic data
(b)
Costing
(c)
Default values
(d)
Scheduling
24.Move time can be defined in
(a)
BOM
(b)
Material Master
(c)
Operation of Routing
(d)
Work Centre
25.Order floats are defined by
(a)
Standard value key
(b)
Schedule margin key
(c)
Standard text key
(d)
Control key
26. Bom items can have following item categories
(a) Stock item
(b) Non-stock item
(c) PRT item
(d) Class item
(e) Document item
(f)
Intra material
(g) Variable size item
(h) All of above
27. Material Bom’s can be created
(a) Specific to plant
(b) Independent of plant
(c ) So that it has more than one variant
BOM
28. For BOM’s there are reports in SAP
(a) To compare 2 Alternate bom’s of same
material and their components
(b) To carry out mass changes in
component quantity
(c ) To see multilevel Bom explosion
29. A Material with multiple Boms
(a) Has more than one alternative Boms
(b) Has number of Variant Boms
(c) Has a super BOM
(d) Can have more than one items
30. Following are various task list types
(a) Routing
(b) Rate Routing
(c ) Master Recipe
(d) Network
(e) Inspection plan
(f) Activity
(g) Operations
31. One routing can
(a )Be valid for multiple materials
(b)Have Multiple operations
(c)Have alternate operations
(d) Have parallel operations
(e) have more than one reference
operation set
32. Standard Value key
(a) Are
defined in Routing and given values in work centre
(b) Are assigned in work center and given
values in routing
(c ) Can have max. 6 parameters.
(d) Can be more than one per work center
or operation
33 . In SAP-APO
a.
Always one resource is created for one
work center in R/3
b.
More than one resource can get created
for one W/C in R/3
c.
Finite Scheduling indicator comes from
R/3 W/C
d.
Working hrs of resources are same as of R/3 W/C.
34. One Work center
a.
Can have more than one capacity category
b.
Can be scheduled based on more than one
capacity category
c.
Can have different formulas for capacity
requirements and scheduling
35. In PPM
a.
R/3 routing sub-operations can be
transferred
b.
Parallel sequence can be transferred
c.
Alternate sequences can be transferred
d.
R/3 Non stock items of BOM can be transferred
36. Engineering workbench can be used for
a.
Material master maintenance
b.
Bom maintenance
c.
Routing maintenance
d.
Transfer of data from R/3 to APO
e.
Making mass changes in Boms &
routings
37. Production versions are
a.
Combination of routing, bom, validity
period and lot size ranges for a material
b.
Only Bom and routing
c.
Only Bom, Routing and lot sizes
d.
Only Bom, routing, lot sizes and validity
period
e.
None of above
f.
Required for routing and BOM transfer to
APO as PPM
g.
Can only be defined in material master
create/change transaction
38. Following cannot get transferred to APO from R/3 while
transferring routing
a.
Phantom assemblies
b.
Operations without work center or control
key values
c.
Operations with formula for scheduing
d.
Engineering change management
39. Activities of PPM
in APO can have
a.
Primary resource
b.
Secondary resource
c.
Multiple mode
d.
Relationships between them(activities)
e.
Input components
f.
Output products
40. Arrange time elements of order in right sequence
a.
Set-up time
b.
Tear down time
c.
Processing time
d.
Move time
e.
Goods receipt processing time
f.
Queue time
g.
Float before prod
h.
Float after production
41. For CIF interface , Business system groups are maintained
in
a.
R/3
b.
APO
c.
Both
d.
None
42. Logical system name are maintained in
a.
R/3
b.
APO
c.
Both
d.
None
43. MRP type X0 is used to
a.
Plan materials in APO
b.
Ensure no planning of material in R/3
c.
Both of above
d.
None of above
44. APO relevant changes in R/3 master data can
a.
Only Update master data in periodically
and need to be triggered manually
b.
Update APO master data on line (real
time)
c.
Update periodically in background
automatically
45. What effect does goods issue of a
production order component have on the components stock requirement list?
(a) The planned order is reduced
(b) The production order is reduced
(c) The dependent requirement is reduced
(d) The reservation is reduced
46. The settlement profile is defaulted
through
(a) Order type
(b) Material type
(c) Work centre category
(d) material master
47. When a production order is split the
original order is described as ____a______ and carries the status as
____b____ whereas the orders that are split off are called _____c______
and they carry a status as ___d___.
(a)
(b)
(c)
(d)
48. Reading PP master data is not
possible for split orders.
(a)
false
(b)
true
49. Automatic goods receipt can be
maintained through
(a)
order type
(b)
order category
(c)
production scheduler
(d)
production scheduling profile
(e)
control key
50. Over/under delivery tolerance is
maintained in
(a)
MRP view in material master
(b)
Work Scheduling view in material master
(c)
Routing header
(d)
BOM item details
51. In standard SAP system under delivery
beyond tolerance is possible
(a)
false
(b)
true
52. In standard SAP system over delivery
beyond tolerance is possible
(c)
false
(d)
true
53. Printing order document is possible
when the system status of the order is
(a)
REL
(b)
CRTD
(c)
PRC
(d)
SETC
54. In a production order individual
operation can be released
(a)
true
(b)
false
55. Triggering of printing of order
documents automatically on release can be set in
(a)
Production order
(b)
Production scheduler
(c)
Routing
(d)
Production scheduling Profile
56. User status can influence System
status
(a)
true
(b)
false
57. Material availability check of
components in a production order depends upon the
(a)
material master of header item
(b)
material master of component item
(c)
order type
(d)
production scheduling profile
58. It is possible to have an external number
assignment for a Production Order
(a)
true
(b)
false
59. In order to create a Production Order
for a material, the procurement type in Material Master should be
(a)
E
(b)
F
(c)
X
60. Backflushing indicator of a component
in a Production Order can be set in Production Order
(a)
true
(b)
false
61. Schedule Margin key in Production
Order defines the floats at
(a)
order level
(b)
operation level
(c)
component level (lead time)
62. What is the relevant Special
Procurement type for collective order?
(a)
32
(b)
31
(c)
52
(d)
01
63. In collective order we can switch
over to child order through parent order
(a)
true
(b)
false
64. ‘Scope of check’ is defined per
(a)
checking group & checking control
(b)
checking rule & checking control
(c)
checking rule & checking group
(d)
checking group & MRP type
(e)
MRP group & checking rule
65. In scope of check we define the
elements to be considered are
(a)
stock element
(b)
cost element
(c)
receipt element
(d)
issue element
(e)
time element
66. What is true or false for serial
number?
(a)
Serial number can not be assigned without
batch number
(b)
Serial number can be controlled at
movement type level also
(c)
Only internal number assignment is
possible
(d)
Serial number can be assigned at the time
of creation order, release order and posting GR.
67.In MAKE TO ORDER production, when can
you see the cost of the production order in the sales order.
(a) When production order is settled
(b) When goods receipt is posted
(c) When sales order is settled